What the show needs on site – to pass on to caretakers, electricians and technical crew. Every venue is different: we clarify the details together, with a site visit if needed.
As of November 2026 · Wegmüller Solutions · booking@thunder-beats.ch
1 CEE 16 A socket (400 V three-phase) near the setup area
Additionally
A normal socket (230 V) for laptop and controller
Cables
I bring extension cables
Interference
High-frequency discharges can disturb sensitive electronics nearby (sound and lighting rigs, radio, phones). We agree on distance and placement together
Earthing
Earth
A good earth connection is required: an existing equipotential bonding/earthing point or a short copper pipe (approx. 30 cm) driven into the ground
Indoors
Clarify the earthing option in advance (equipotential bonding bar, stage earthing point)
Space and room
Coils
Two coils, each about 80 cm tall (toroid Ø 40 cm), plus the controller
Setup area
Level, firm ground; table or stage by arrangement
Safety zone
Cordoned-off zone between coils and audience. I set the distance for each venue (arcs up to about 1 m); barrier material by arrangement
Ceiling height
Indoors enough height above the coils – clarified per room
Ventilation
Ventilate enclosed rooms (the discharges produce some ozone)
Surroundings
No flammable materials and no metal parts within arc reach
Fire alarms
Clarify smoke detectors and fire alarm systems with the caretaker or fire service beforehand; some venues require fire service attendance
Weather and light
Outdoors
Dry weather only; no show in rain or wet conditions. Strong wind affects the discharges
Season
Summer evenings are ideal, but the show then only starts after sunset, so rather late. In winter it gets dark earlier
Light
Darken rooms indoors: it doesn’t have to be pitch black, but in daylight the arcs are hard to see. Switch off bright courtyard or hall lighting during the sets
Time
Setup
About 2 hours before the first show, including a test run
Teardown
About 30 minutes after the last set
Sets
Several short sets with breaks for the coils to cool; usually 15–30 minutes of playing time in total
Lead time
Enquiries ideally several weeks before the event; site visit beforehand if needed
Audience and health
Loudness
Sparks are loud (raw, crackling). Hearing protection recommended for the front rows and for children; small children further back
Flashing light
Bright, rapidly flickering sparks in a darkened room. Notice for light-sensitive people (photosensitive epilepsy) in the invitation or at the entrance, announcement before every set
Implants
People with a pacemaker, implanted defibrillator, cochlear implant or other electronic implant stay well outside the cordoned-off area; the distance is set on site
Announcement
Short notice on loudness, light and implants by Maz before every set
Who does what
I bring and am responsible for
Both coils, controller, extension cables, earthing material
Setup, test run, operation, teardown
Safety zone and briefing on site
Protective mechanisms of the coils (overcurrent shutdown, limited pulse width)
The organiser provides
Power connection as specified above
A way to earth the rig
Setup area and room for the safety zone
A technical contact person on the day
Music rights for requested pieces (SUISA registration by the organiser)