For organisers and technical staff

Technical rider

What the show needs on site – to pass on to caretakers, electricians and technical crew. Every venue is different: we clarify the details together, with a site visit if needed.

As of November 2026 · Wegmüller Solutions · booking@thunder-beats.ch

Request a quote

Power

Three-phase 1 CEE 16 A socket (400 V three-phase) near the setup area
Additionally A normal socket (230 V) for laptop and controller
Cables I bring extension cables
Interference High-frequency discharges can disturb sensitive electronics nearby (sound and lighting rigs, radio, phones). We agree on distance and placement together

Earthing

Earth A good earth connection is required: an existing equipotential bonding/earthing point or a short copper pipe (approx. 30 cm) driven into the ground
Indoors Clarify the earthing option in advance (equipotential bonding bar, stage earthing point)

Space and room

Coils Two coils, each about 80 cm tall (toroid Ø 40 cm), plus the controller
Setup area Level, firm ground; table or stage by arrangement
Safety zone Cordoned-off zone between coils and audience. I set the distance for each venue (arcs up to about 1 m); barrier material by arrangement
Ceiling height Indoors enough height above the coils – clarified per room
Ventilation Ventilate enclosed rooms (the discharges produce some ozone)
Surroundings No flammable materials and no metal parts within arc reach
Fire alarms Clarify smoke detectors and fire alarm systems with the caretaker or fire service beforehand; some venues require fire service attendance

Weather and light

Outdoors Dry weather only; no show in rain or wet conditions. Strong wind affects the discharges
Season Summer evenings are ideal, but the show then only starts after sunset, so rather late. In winter it gets dark earlier
Light Darken rooms indoors: it doesn’t have to be pitch black, but in daylight the arcs are hard to see. Switch off bright courtyard or hall lighting during the sets

Time

Setup About 2 hours before the first show, including a test run
Teardown About 30 minutes after the last set
Sets Several short sets with breaks for the coils to cool; usually 15–30 minutes of playing time in total
Lead time Enquiries ideally several weeks before the event; site visit beforehand if needed

Audience and health

Loudness Sparks are loud (raw, crackling). Hearing protection recommended for the front rows and for children; small children further back
Flashing light Bright, rapidly flickering sparks in a darkened room. Notice for light-sensitive people (photosensitive epilepsy) in the invitation or at the entrance, announcement before every set
Implants People with a pacemaker, implanted defibrillator, cochlear implant or other electronic implant stay well outside the cordoned-off area; the distance is set on site
Announcement Short notice on loudness, light and implants by Maz before every set

Who does what

I bring and am responsible for

  • Both coils, controller, extension cables, earthing material
  • Setup, test run, operation, teardown
  • Safety zone and briefing on site
  • Protective mechanisms of the coils (overcurrent shutdown, limited pulse width)

The organiser provides

  • Power connection as specified above
  • A way to earth the rig
  • Setup area and room for the safety zone
  • A technical contact person on the day
  • Music rights for requested pieces (SUISA registration by the organiser)

Technical questions

Maz Wegmüller, Wegmüller Solutions · booking@thunder-beats.ch · 076 403 42 75

Every venue is assessed individually before confirmation; the quote records the binding requirements.