40 kVFor careers fairs, electrical and energy trade shows, open days

Trade fairs and public events

The stand everyone stops at: a short set every sixty to ninety minutes, conversations at the rig in between. Especially for exhibitors who work with electricity, energy or technology.

Teslaspule mit voller Korona aus Entladungen rund um den Toroid

100 kVWhat your stand gets

  • Footfall

    Arcs are visible and audible across a hall. Every set brings a new wave to the stand.

  • A conversation starter that fits

    High voltage, power electronics, earthing, safety: for electrical and energy companies the show is a natural lead-in to your own offer – and at careers fairs a hook for apprentices.

  • Plannable

    Fixed show times across the day, loudness and duration matched to the hall, a clear safety zone.

140 kVSuitable format

Spark

Three to five short sets spread over the day. In between, the coils cool down and I am at the stand for questions.

  • 3–5 sets of 5–8 minutes
  • show times by arrangement, e.g. hourly
  • price on request

170 kVHow it works

  1. Before Stand plan, power connection, earthing and safety zone agreed with you and the fair (rider).
  2. Setup The day before or early morning; test run before the hall opens.
  3. Sets Short, loud, visible – with two sentences on why the arcs make music.
  4. In between The coils as an eye-catcher at the stand; I answer questions – gladly together with your team.

195 kVWhat the stand needs

Three-phase power at the stand, a way to earth the rig, space with a safety zone, agreement with the fair on loudness and radio interference. Details in the technical rider.

Technical rider →

200 kVEnquiry

Planning a fair?

Tell me the fair, the date and the stand size – I will get back to you with questions and a quote.

Enquire for trade fairs